{"id":458066,"date":"2026-11-10T14:32:22","date_gmt":"2026-11-10T13:32:22","guid":{"rendered":"https:\/\/bim-me-up.com\/?p=458066"},"modified":"2026-11-10T14:32:27","modified_gmt":"2026-11-10T13:32:27","slug":"ifc-data-to-be-used-specifically-in-data-exchange-webinar","status":"publish","type":"post","link":"https:\/\/bim-me-up.com\/en\/ifc-data-to-be-used-specifically-in-data-exchange-webinar\/","title":{"rendered":"Targeted use of IFC data: Data Exchange Webinar"},"content":{"rendered":"<p class=\"wp-block-paragraph\">IFC models often contain more information than a particular workflow requires. With Data Exchange, you can select only the elements and properties you need -for example, specific component classes or room geometry.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the webinar on\u00a0<strong>November 16th<\/strong>\u00a0We show how such data exchanges can be created and used in other applications:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>In Revit (and many other BIM authoring systems) Data Exchanges can be loaded as a stable reference.<\/li>\n\n\n\n<li>In Power BI, Data Exchanges form the basis for analyses, volume calculations, and other data-driven insights. <\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">What excites me most is that when the IFC file is updated, the corresponding Data Exchange is updated too, with its filters intact. There\u2019s no need to coordinate who needs to update what: simply upload the new IFC version to Forma. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As an old openBIM enthusiast, I\u2019m looking forward to share these workflows and the latest features with you.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Sign up now and be part of it: <a href=\"https:\/\/autodesk.zoom.us\/webinar\/register\/8017943172369\/WN_wjVCqceSS0aejDcsisseDw\">Register for the webinar<\/a><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">More background:&nbsp;<a href=\"https:\/\/bim-me-up.com\/en\/interoperability-rethought-data-exchange-cloud-connector-for-ifc\/\">Data Exchange Cloud Connector for IFC<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>IFC-Modelle enthalten oft mehr Informationen, als f\u00fcr einen konkreten Workflow ben\u00f6tigt werden. Mit Data Exchange lassen sich gezielt die Elemente und Eigenschaften ausw\u00e4hlen, die gerade relevant sind \u2013 zum Beispiel bestimmte Bauteilklassen oder gar Raumgeometrien. Im Webinar am\u00a016. November\u00a0zeigen wir, wie sich solche Data Exchanges erstellen und in anderen Anwendungen nutzen lassen: Das spannendste aus [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[120,117],"tags":[],"class_list":["post-458066","post","type-post","status-publish","format-standard","hentry","category-data-exchange","category-ifc"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/p2lEa7-1Vaa","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts\/458066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/comments?post=458066"}],"version-history":[{"count":2,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts\/458066\/revisions"}],"predecessor-version":[{"id":458068,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts\/458066\/revisions\/458068"}],"wp:attachment":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/media?parent=458066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/categories?post=458066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/tags?post=458066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}