{"id":456850,"date":"2020-06-08T07:00:32","date_gmt":"2020-06-08T05:00:32","guid":{"rendered":"https:\/\/bim-me-up.com\/?p=456850"},"modified":"2020-06-07T12:34:13","modified_gmt":"2020-06-07T10:34:13","slug":"impact-of-covid-19-on-the-construction-industry","status":"publish","type":"post","link":"https:\/\/bim-me-up.com\/en\/impact-of-covid-19-on-the-construction-industry\/","title":{"rendered":"Impact of COVID-19 on the construction industry"},"content":{"rendered":"<p>400 leading representatives from the construction industry were surveyed, including almost 40% from Europe.<\/p>\r\n\r\n\r\n\r\n<div class=\"wp-block-image\">\r\n<figure class=\"aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"918\" data-attachment-id=\"456846\" data-permalink=\"https:\/\/bim-me-up.com\/en\/draggedimage-1-png\/\" data-orig-file=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?fit=1900%2C1454&amp;ssl=1\" data-orig-size=\"1900,1454\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?fit=300%2C230&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?fit=750%2C574&amp;ssl=1\" class=\"wp-image-456846\" src=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?resize=1200%2C918&#038;ssl=1\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?w=1900&amp;ssl=1 1900w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?resize=300%2C230&amp;ssl=1 300w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?resize=750%2C574&amp;ssl=1 750w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?resize=768%2C588&amp;ssl=1 768w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?resize=1536%2C1175&amp;ssl=1 1536w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-1.png?resize=902%2C690&amp;ssl=1 902w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\r\n<\/div>\r\n\r\n\r\n\r\n<p>It is no secret that the construction industry brings up the rear not only in terms of the low productivity growth of 1% but also, and above all, in the area of digitalization. According to the McKinsey Industry Digitization Index, only <em>Agriculture and Hunting<\/em> less digitized - that should have given us food for thought long ago:<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img data-recalc-dims=\"1\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/www.researchgate.net\/profile\/Jack_Davies21\/publication\/323750171\/figure\/fig3\/AS%3A631581131677698%401527592084203\/Global-industry-digitisation-index-McKinsey-Global-Institute.png?w=1200&#038;ssl=1\" alt=\"\" \/><\/figure>\r\n\r\n\r\n\r\n<p>At the same time, however, the ranking also shows that real estate is well ahead of construction and is even described as the digital leader within the less digitized sectors - another signal for the construction industry.<\/p>\r\n\r\n\r\n\r\n<p>You often hear the saying \"we've always done it this way, we don't have time for digitalization at the moment\". However, in parallel to digitalization, the construction industry is also lagging well behind other industries in terms of growth, as this illustration from the <a href=\"https:\/\/www.mckinsey.com\/industries\/capital-projects-and-infrastructure\/our-insights\/reinventing-construction-through-a-productivity-revolution\">McKinsey \"Reinventing Construction\" <\/a>Paper shows:<\/p>\r\n\r\n\r\n\r\n<div class=\"wp-block-image\">\r\n<figure class=\"aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"584\" data-attachment-id=\"456849\" data-permalink=\"https:\/\/bim-me-up.com\/en\/draggedimage-2-png\/\" data-orig-file=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?fit=1772%2C862&amp;ssl=1\" data-orig-size=\"1772,862\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?fit=300%2C146&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?fit=750%2C365&amp;ssl=1\" class=\"wp-image-456849\" src=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?resize=1200%2C584&#038;ssl=1\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?w=1772&amp;ssl=1 1772w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?resize=300%2C146&amp;ssl=1 300w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?resize=750%2C365&amp;ssl=1 750w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?resize=768%2C374&amp;ssl=1 768w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?resize=1536%2C747&amp;ssl=1 1536w, https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage-2.png?resize=1418%2C690&amp;ssl=1 1418w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\r\n<\/div>\r\n\r\n\r\n\r\n<p>The current study clearly summarizes the reasons for this - construction projects are complex and always associated with new \/ increasing requirements, while at the same time we are struggling with an increasing shortage of skilled workers.<\/p>\r\n\r\n\r\n\r\n<p>It is not news that the construction industry needs to be digitized - this process has already begun, but it is being accelerated by the impact of COVID-19. Not dealing with digitalization is a luxury that we can no longer afford.<\/p>\r\n\r\n\r\n\r\n<p>The McKinsey study also describes other important factors - such as industrialization and the introduction of new materials and business models, which are summarized in this diagram:<\/p>\r\n\r\n\r\n\r\n<div class=\"wp-block-image\">\r\n<figure class=\"aligncenter\"><img decoding=\"async\" data-attachment-id=\"456845\" data-permalink=\"https:\/\/bim-me-up.com\/en\/draggedimage-tiff\/\" data-orig-file=\"https:\/\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage.tiff\" data-orig-size=\"\" data-comments-opened=\"1\" data-image-meta=\"[]\" data-image-title=\"\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage.tiff\" data-large-file=\"https:\/\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage.tiff\" class=\"wp-image-456845\" src=\"https:\/\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage.tiff\" alt=\"\" \/><\/figure>\r\n<\/div>\r\n\r\n\r\n\r\n<p>All this leads to 9 factors (top center) that will shape our future:<\/p>\r\n\r\n\r\n\r\n<ol class=\"wp-block-list\">\r\n<li><strong>Product orientation<\/strong><br \/>Construction is increasingly being transferred from the building site to factories, where building components are assembled automatically using defined modules in a similar way to vehicles on production lines and then simply assembled on site.<\/li>\r\n<li><strong>Specialization<\/strong><br \/>In order to remain competitive, a high degree of specialization is expected, in which individual companies can offer the highest possible quality and expertise in certain areas (niches).<\/li>\r\n<li><strong>Higher utilization of the value chain<\/strong><br \/>Planning and construction is highly fragmented today. In the future, we will have to move closer together in order to exploit the full potential of new technologies such as BIM.<\/li>\r\n<li><strong>Growing together<\/strong><br \/>Due to the aforementioned product orientation and specialization, many areas will grow closer together.<\/li>\r\n<li><strong>Customer centricity and brand awareness<\/strong><br \/>Today, the motto in many areas is \"the cheapest gets the contract\". However, with increasing demands and quality requirements, this point will also change and will be strongly influenced by the brand and reputation of a company with regard to the quality of its services.<\/li>\r\n<li><strong>Investment in technology and equipment<\/strong><br \/>Our product orientation will inevitably lead us to invest not only more in production facilities, but also in new technologies such as robots and automation, as well as discovering new subject areas.<\/li>\r\n<li><strong>Investment in employees<\/strong><br \/>All of the areas already mentioned are not possible without trained and committed employees, which is why topics such as further training and employee development will play an increasingly important role.<\/li>\r\n<li><strong>Globalization<\/strong><br \/>Standardization will make it increasingly easy to offer services across borders in the future. However, this process could be slowed down somewhat by COVID-19.<\/li>\r\n<li><strong>Sustainability<\/strong><br \/>Topics such as the carbon footprint of buildings and the impact of the construction industry on climate change are playing an increasingly important role and will become even more prominent.<\/li>\r\n<\/ol>\r\n\r\n\r\n\r\n<p>According to McKinsey, additional profits of up to USD 265 billion per year are possible in the construction sector worldwide over the next 15 years - we currently seem to be voluntarily foregoing this.\u00a0<\/p>\r\n\r\n\r\n\r\n<p>COVID-19 has so far proven to be a major driver of digitalization. It will not and should not be \"as before\" - rather, we should emerge stronger and not only be better prepared for similar situations in the future, but also increase our productivity.\u00a0<\/p>\r\n\r\n\r\n\r\n<p><a href=\"https:\/\/www.mckinsey.com\/industries\/capital-projects-and-infrastructure\/our-insights\/the-next-normal-in-construction-how-disruption-is-reshaping-the-worlds-largest-ecosystem\">Link to the study on McKinsey.com <\/a><\/p>","protected":false},"excerpt":{"rendered":"400 leading representatives from the construction industry were surveyed, including almost 40% from Europe. It is no secret that...","protected":false},"author":1,"featured_media":456847,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":{"0":"post-456850","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-allgemein","8":"cs-entry","9":"cs-video-wrap"},"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/bim-me-up.com\/wp-content\/uploads\/2020\/06\/DraggedImage.png?fit=1554%2C1032&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p2lEa7-1UQy","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts\/456850","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/comments?post=456850"}],"version-history":[{"count":6,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts\/456850\/revisions"}],"predecessor-version":[{"id":456856,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/posts\/456850\/revisions\/456856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/media\/456847"}],"wp:attachment":[{"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/media?parent=456850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/categories?post=456850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bim-me-up.com\/en\/wp-json\/wp\/v2\/tags?post=456850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}